

Brand activations · 2026
Mercedes-Benz CLA Launch “The Gathering” 2026 — Travelling launch stage set
One travelling stage set, made once in Cape Town, carried the new CLA launch through Cape Town, Johannesburg and KwaZulu-Natal.
At a glance
- Client
- Named on approval
- Event / campaign
- Mercedes-Benz CLA Launch “The Gathering” 2026
- Location / venue
- Silo District, V&A Waterfront, Cape Town
- Date
- Set type
- Brand activations
- Services
- Set design & visualisation · Set construction & fabrication · Stages & scenic structures · Installation & strike
- Status
- Built + concept render
- Venue address
- Silo District, V&A Waterfront, Silo Square, V&A Waterfront, Cape Town, Western Cape, 8001
In short
Atlantic Sets designed and built the travelling stage set for the South African launch of the new Mercedes-Benz CLA, “The Gathering”, in 2026. Manufactured once in Cape Town, the Patagonia Red set was installed for a media launch and public launches in Cape Town, Johannesburg and KwaZulu-Natal, ending at the Silo District.
01 The brief
The launch followed the global CLA “The Gathering” city-takeover format: a three-day media launch in Cape Town, then public launches in Johannesburg, KwaZulu-Natal and Cape Town.
The core installation called for a stage wall 21.6 m wide and 3.6 m high on a T-shaped footprint 13.2 m deep, in the CLA’s Patagonia Red palette, as one set that could travel between cities.
02 Our response
Because one set had to serve three cities, Atlantic Sets designed it to be manufactured once in Cape Town and re-installed in each city. Main-stage drawings and concept renders were issued in June 2026, and the stage wall was integrated with a large LED centre screen and side screens.
03 Delivery
The set and technical installation were delivered for the media launch in Cape Town and the public launches at Melrose Arch in Johannesburg, Oceans Mall in KwaZulu-Natal and the Silo District in Cape Town. In Cape Town the set was built on 21 September, launched on 23 September and struck on 24 September 2026.
04 Outcome
- one travelling set
- 3 cities
- stage wall, 3.6 m high
- 21.6 m
- strike in Cape Town
- 1 day
One travelling set carried the launch through three cities. The project was delivered well and the client was happy with the result.
Gallery













Materials and specs
Built to spec.
| Stage wall | 21.6 m wide × 3.6 m high |
|---|---|
| Footprint | T-shaped, 13.2 m deep |
| Palette | Patagonia Red |
| Screens | 21 m² LED centre screen (3.5 × 6 m) plus 10 m² of side screens |
| Manufacture | Built once in Cape Town; re-installed in each city |
About this build
Questions
It was manufactured once in Cape Town as a travelling set and re-installed for each city’s launch.
The stage wall was 21.6 m wide and 3.6 m high, on a T-shaped footprint 13.2 m deep.
Tags
- Automotive
- Launch
- Reveal
- Stage
- Modular

